MCF Post Cushion® for Wire Rope Safety Barriers

MCF Post Cushion® for Wire Rope Safety Barriers

RetroPost® - the Flexible Rubber Sign Post

RetroPost® - the Flexible Rubber Sign Post

Flexible GuidePosts - with Retro-Tuff® Hinge

Flexible GuidePosts - with Retro-Tuff® Hinge

Flexi-Tuff® - Flexible Street Sign Hinge

Flexi-Tuff® - Flexible Street Sign Hinge

Flexi-Tuff® - Self Recovering Work-Zone Bollards

Flexi-Tuff® - Self Recovering Work-Zone Bollards

Retro-Tuff® Self-Recovering Refuge Barriers

Retro-Tuff® Self-Recovering Refuge Barriers

Hi-Vis Rubber Wheel Stops

Hi-Vis Rubber Wheel Stops

Mine Post

Mine Post – Mine haul road safety – 24 hours a day

The Haul Road Edge Marker Post (Mine Post)  is fitted with a specifically designed “Flexi-Tuff®” patented hinge system and offers the unique ability to ‘automatically’ fully recover itself to an upright position following a collision. Between 2008 and 2011, 26 mining workers died from work related deaths, 50% of these involved a vehicle.  Vehicle accidents and roll-overs are a major OH&S hazard,  The annual cost to the industry through insurance claims, lost time, injuries and equipment repairs is substantial.

Mine Truck Rollovers Cost Time, Money & Lives


Rollovers – cost money

Rollovers – cost time

Rollovers – cost lives!  

… every life lost is ONE TOO MANY!

 

Dig in and Driveable OptionsFeatures:

  • The unique Flexi-Tuff® Hinge Technology ensures the post returns to an upright position – time and time again!
  • An extensive range of optional coloured ‘post pockets’ or ‘wrap around Class 1A Delineators” are available to provide ‘easy to see’, reflective guidance for road users
  • Easy to install – Two options: driveable spikes and ‘dig-in’ rubber hinge
  • Made from a durable polycarbonate material

Haul Road Edge Post - Cooks Colliery

Technical Data:

Product Code: 8080
Height:
2.5m
Wall Thickness: 2mm
Post Diameter: 80mm

 

 

 

Installation:  

Installation 2Installation 1Installation 3


Installation is achieved using the same process as for our range of flexible guide posts – these photos are showing installation with a jackhammer and tool attachment.

 

Case Studies:

View case study: Cook Colliery Blackwater QLD

 

Gallery: